Use approved ESD procedures to prevent damage.
to the DC-UPS service position
, as shown in Figure 1. Refer to Management console service positions (Model 961).
fully into the rack. See Figure 1. This allows access
to the top and rear of the CEC enclosure.
, as shown in Figure 2.
, as shown in Figure 2.
blinking? 

. See Figure 5. 
(10 mm hex head) that secure the CEC
enclosure
to the rack. See Figure 6. 
down on both the left and right sides,
and pull the CEC enclosure full out. See Figure 7.
located at the back of the cover.
, lift them into the open position,
and then lift the card out of the slot. 
on the memory riser. Doing this activates
the LED
associated with the failing DIMM.
See Figure 10 and Figure 11.
(In Figure 11,
is the Identify/Fault LED for the
memory card. See CEC enclosure LED indicators (Model 961) for more
information.)

open as shown in Figure 12. Lift the memory module
out of the connector. The lever action
of the tabs forces the memory module out of the connector. 
are pushed open into the unlocked
position, as shown in Figure 13,
before installing a new memory module.
and align it with the connector. 
into the open position, lower the
memory card into the slot, and then close the card latches until they
snap into place. 
located on the back of the service
access cover with the two holes on the back of the system chassis.Is the DC Good green LED blinking on one or both power supplies?

to slow blink, as shown in Figure 5. Is the green LED blinking?
on the slide-out tray. See Figure 1.
out to the service position.
to the standard service position
. Carefully route the cable bundle.