Use approved ESD procedures to prevent damage.

,
(PPS to RPC
cables), and
PPS-PPS communication
cable in the proper sequence to prevent possible problems to the other PPS. Ensure
you carefully follow the steps in this procedure.
to identify the PPS being
repaired.
to identify the PPS being
repaired.
to the left of the gate and at the
bottom of the storage enclosure chassis might need to be removed to
allow the gate to swing open. Remove the two screws
that fasten the baffle to the 19"
rack mount vertical rails. If the baffle is the new level sheet metal,
it has a flexible plastic cutout that bends out of the way when the
gate is swung open. 
to the service position by removing
the two screws
and swinging it open to the left.
See Figure 3. 
to off (down).
.

securing the mainline power cable
to PPS2 (lower PPS).
Remove the screw securing the mainline power cable bracket, and then
remove the mainline power cable bracket
. See Figure 6. 
. See Figure 7. 

from the power sequencer module
and then slide the module out. See Figure 9.
to fully remove it from the rack.
,
(PPS to RPC
cables), and
PPS-PPS communication
cable in the proper sequence to prevent possible problems to the other PPS. Ensure
you carefully follow the steps in this procedure.
and
cables now to the sequence module.
See Figure 5 above.
.
. See Figure 4.