This is not a stand-alone procedure. Customer disruption and damage
to the hardware might occur if microcode and power boundaries are
not in the proper conditions for this service action.
If you were sent here by a serviceable event FRU repair, the microcode
and power boundaries have already been set.
If there is no FRU identify indicator or location code, you
were sent here by an isolation MAP or symbolic FRU procedure. Use the information in that procedure
and the figures in this procedure to locate the proper part to exchange.
Most, but not all, FRUs have identify indicators. Use the flashing amber or solid blue FRU identify indicators to ensure that you are working
on the correct enclosure or FRU.
The "light path" identify LEDs are a hierarchy of LEDs that can
identify the rack, enclosure, FRU, and even the FRU connector to which a cable is
connected.
Unlatch the fan release lever in the upper right corner of the fan.
Then, use it to pull the fan assembly straight out from the I/O enclosure.
Figure 4. Removing the I/O enclosure fan
At the rear of the rack, unplug all the cables
(PCIe, SPCN , FC-AL , and customer host ). Ensure that the cables are labeled
so they can be properly replugged. See Figure 5.
Figure 5. PCIe, SPCN, FC-AL, customer
host cables
To disconnect the cable at the left side of the PDU, release
the cable connector retainer. See Figure 6.
Figure 6. PDU connectors
Remove the I/O enclosure chassis from the rack. See Figure 7.
At the rear of the rack, remove the two hold-down screws .
Push the I/O enclosure forward towards the front of
the rack .
At the front of the rack, pull the I/O enclosure out
the front being careful to balance it when it is free of the rack.
Place the I/O enclosure on a static-free surface.
Figure 7. Remove the I/O enclosure
chassis
Remove the failing power cable.
Install the I/O enclosure power supply to the PDU cable
Procedure
Install the new power cable alongside the I/O enclosure.
Slide the I/O enclosure back into the rack and install
the two hold down screws.
At the rear of the rack, connect all the cables to the
I/O enclosure.
At the front of the rack install the two power
supplies. Ensure that the red latch beneath the input power connector
is secure.
Reinstall the I/O power supply retention bracket.
Install and latch the two fans.
Connect the two black power cables to the power
supplies.
Route and connect the power cables to the PDU.
At the bus bars, slide the blue retention bracket
back in position.
Reinstall the cable retention hardware.
Exit this service information center parts
exchange procedure and return to the procedure that sent you here.