Checking cables
Procedure
- If you are installing Rack-2, and the PCIe and SPCN cable bundle
is pre-installed in Rack-2, at the rear of each I/O enclosure
gently push on each PCIe cable (P1-C7-T1 and P1-C7-T2) to ensure that
it is fully seated and latched. See Figure 1.
Note: If the PCIe and SPCN cable bundle
is not pre-installed in Rack-2, this step does not apply.
Figure 1. I/O enclosure PCIe locations
(rear)
- At the rear of the rack behind the DC-UPS power
supplies, ensure all power cables connected to each power distribution
unit connector J1-J10 are fully seated. Figure 2.
Figure 2. Locations for power distribution unit (PDU) connectors
- Are there more expansion racks to install on this storage