There must be no unrepaired serviceable events prior to
beginning the installation.
Procedure
- At HMC1 (primary role) in
SF #1, display and repair any open serviceable events on the existing
storage facility that the new rack will be installed to:
- From the navigation area, click Service
Management.
- In the right work area, click Manage
Serviceable Events. A window opens and displays a list
of selection criteria.
- You can use the default criteria or
modify the criteria for your needs. Click OK.
The Serviceable Event Overview window opens.
- Repair any serviceable events before you continue with
the installation. Select a serviceable event. Click . The guided process window opens.
- At HMC1 (primary role) in
SF #1, view the storage facility status (end of call). If any of the
system check results display as FAILED, view the details and refer
to "MAP1100 View storage facility (end of call)." Before you continue
the installation, all status fields should display as PASSED.
- From the navigation area, click .
- From the bottom Task area, click . A window displays
the status (passed/failed) of 25 or more system checks. The following
is an example.
Figure 1. Window: View Storage Facility
State
Note: If the status for Large File Transfer (the
tenth System Check Type status from the top) displays as FAILED, the
remaining System Check Types below it cannot be displayed.
- To display further details, select a row and click Details.
Attention: At LIC bundle
levels below 76.10.xx.yy, do not continue with this installation until
you confirm whether this storage facility is set for three-phase power.
If the storage facility is set for single-phase power, contact your
next level of support.
- For LIC bundle levels
76.10.xx.yy and above, continue to the next section. For LIC bundle
levels below 76.10.xx.yy, perform the following steps to check the
input power phase setting.
- From the navigation area, click .
- From the bottom Task area, click
- Look for inputPowerPhase in the
Attribute Identifier column.
- If the value is 3-phase, you can continue with
this expansion rack installation.
- If the attribute value is single-phase, stop and
contact your next level of support.