DS8000 Service Documentation Version 7.5
Checking customer voltage with customer CB off (wired)
Procedure
- Prepare the multimeter to measure 1.0 V ac or less.
- Measure the voltage between each pair of voltage pins on
the mainline power cable connector at the DC-UPS end.
- For three-phase high voltage (380 - 415 V) ( A to B , B to C , C to A ).
See Figure 1.
- For single-phase ( A to B ).
See Figure 2.
Did any voltage measure more than 1.0 V ac?
- Yes, inform the customer that one or more voltage pins on
the customer supply measured greater than 1.0 V ac even though the
circuit breaker is off. Do not continue until the voltage is less
than 1.0 V ac.
- No, continue with step 3.
Figure 1. Three-phase high voltage (380 - 415 V) mainline
power connector at DC-UPS end
Figure 2. Single-phase mainline power
connector at DC-UPS end
- Measure the voltage between each voltage
pin and the ground pin on each mainline power cable connector at the
DC-UPS end.
- For three-phase high voltage (380 - 415 V) ( A to Ground, B to
Ground, C to Ground ). See Figure 1.
- For single-phase (200 - 240 V) ( A to
Ground, B to Ground). See Figure 2.
Did any voltage measure more than 1.0 V ac?
- Yes, inform the customer that one or more voltage pins on
the customer supply measured greater than 1.0 V ac even though the
circuit breaker is off. Do not continue until the voltage is less
than 1.0 V ac.
- No. For three-phase high voltage (380 - 415 V), go to step 4. For single-phase continue with Checking customer voltage with customer CB on (wired).
- Measure the voltage between the Neutral pin to
the ground pin on each mainline power cable connector at the DC-UPS
end.
Did any voltage measure more than 1.0 V ac?