DS8000 Service Documentation Version 6.3.3

Checking the expansion rack switch settings

Procedure

  1. Only on the expansion rack being installed, ensure the rack operator panel UEPO red switch is in the Off (bottom Callout label 2 pushed in ) position. See Figure 1.
    Figure 1. UEPO switch
    UEPO switch
  2. Use Table 1 to check the switch setting on both PPSs (upper and lower) in the expansion rack being installed.
    Table 1. Switch settings and locations for expansion rack PPS modules and battery assemblies
    Switch Setting Location Figure reference
    Battery assembly circuit breakers CB0 and CB1 On (up) At the rear of the battery module assemblies Callout label 2 in Figure 2
    Primary power supply circuit breaker CB00 Off (down) On each PPS, on the AC input power module (rear of rack) Callout label 1 in Figure 2
    Primary power supply sequencer module enable/disable switches Enabled (up) Three switches on each sequencer module (rear of rack) Callout label 1 in Figure 3
    Enable/disable switches on the PPS 208V DDM power module Enabled (up) Two switches on each PPS 208V DDM power module (rear of rack) Callout label 1 in Figure 4
    Enable/disable switch on the PPS booster power module (Power Line Disturbance [PLD] module), if present Enabled (up) Optional module, only present for PLD feature. One on each PPS on booster power module (rear of rack) Callout label 1 in Figure 5
    Figure 2. Rear of rack PPS and battery module enclosure circuit breakers
    Rear of rack PPS and battery module enclosure circuit breakers
    Figure 3. Model 951 PPS sequencer module and LED enable/disable switch
    Model 951PPS sequencer module and LED enable/disable switch
    Figure 4. Enable/disable switch on a 208V DDM power module (PPS)
    Enable/disable switch on a 208V DDM power module (PPS)
    Figure 5. Enable/disable switch on booster power module
    Enable/disable switch on booster power module
  3. Continue with Checking expansion rack UEPO switch operation.