Unpacking the expansion rack and verifying the ship group is complete
Procedure
- If the expansion rack was shipped directly from IBM manufacturing, remove the CE Unpacking Instructions from the Customer Engineer envelope that is taped to the front of the storage facility below the CEC enclosures. Use the CE Unpacking Instructions to unpack the storage facility frame(s) and prepare it for installation.
- Verify that all items in the
ship group were received.
- The ship group comes in one or more large boxes on pallets. The customer may not allow the pallet and large box in their machine room. Consequently, you can end up with a pile of parts on the floor.
- The side decorative covers that go between the racks are either packed in a separate long narrow box (early version) or are packed in the large ship group box (later version). The side covers for the later version fold in half.
- If the expansion rack is from IBM manufacturing, the hardcopy listing of the ship group contents is shipped loose with the other parts inside the large boxes. If it is missing, check if it was accidently discarded along with the pallets and large boxes. An additional copy of the paperwork may be included in the CE Envelope.
- The official ship group listing of parts is included in the ship group. Table 1 is for reference only.
Table 1. Service ship group part numbers (expansion rack) (Models 941, 94E) Description Part number Bolt, M8 x 20, interrack spacer 1621545 CD-ROM, LIC bundle 1 CD-ROM, Customer Documents 1 CD-ROM, Service Documents 1 Cover, interrack decorative, side (one-piece) 22R4964 Cover, interrack decorative, side (two-piece, hinged)2 23R10502 Cover, interrack decorative, top 22R4962 Drawing, interrack spacer stud 22R5481 Label, operator panel warning, translated 22R1789 Publication, Environmental Notices and User's Guide 80Y2056 Publication, Adding an Expansion Rack to an Existing Storage Facility 1 Publication, IBM Warranty Information 45W7866 Publication, Waste Equipment (WEEE) 22R5822 Spacer stud, interrack 22R5046 Tag, "Do Not Operate" 23R0280 Tie wrap 07J6655 Washer, M8, interrack spacer 84X5850 Wheel chocks (set of 4) 08J5557 Notes:- The part number changes with each release. Contact your next level of support.
- A bracket (23R2044) and two nuts (84X4841) secure the two pieces at the hinge.
- Place the ship group parts list in the document enclosure (front upper left of rack 1). This list can be used for future removal of the storage facility.